Now, I’ve already showed you the transformation of our toilet facilities in my “Flushed with Success” post but I couldn’t open the hall building up with the place looking like it hadn’t been decorated since 1887, so I thought you’d like to see some Before and After shots –
First came the entrance to the hall which needed the roof leak repaired, the ceiling re-plastered, walls and ceiling re-skimmed and finally a transforming paint job….
You can also see the beautiful boardroom table which was donated to us by Glasgow Community Safety. (Many thanks guys) It’ll be moved to our Training Room once that is renovated. 🙂
Next came the corridor, filling in the cracks and holes, sanding all the gloss paint down, bleaching off the years of mould and finally painting it….
And lastly came the kitchen changed from a cluttered, wallpaper walled, mould ridden mess into a re-plastered look (re-plastered mainly due to part of the original plaster wall disintegrating when the wallpaper came off and partly due to the original gloss paint underneath the wallpaper peeling in patches and making the whole wall an uneven mess)….
And finally transformed completely with a coat of paint (well, several coats actually)…..
I’m delighted with the finished results.
It took me many weeks to finish the paint job but with Paul the builder and his team helping me re-plaster and skim the walls, I eventually got the job done. 🙂
I hope you like it as much as I do.
Next time I will tell you about the Victorian advert we found for Harness’ Electropathic Belts but for now, stay safe – and keep smiling 😀
Alan Bell
The Ardross-man
April 1, 2016 at 9:51 am
Well done Alan – it looks great! It’s all starting to come together thanks to your hard work and dedication. Bravo 🙂
LikeLike
April 2, 2016 at 2:47 pm
Fingers crossed 🙂
LikeLike
April 1, 2016 at 12:31 pm
What a fabulous job – excellent!
LikeLike
April 2, 2016 at 2:48 pm
Getting there slowly but surely Kerry 👍🙂
LikeLike